Monday 4 March 2013

Development of my Teepee

Day One of making the Teepee:

This was made from my last idea that then got inspired by kevin langan and is now being made this is just the being on the making, this will take up to 2 weeks to get my idea develop it and make it. as well there is add bits that i want with this piece that i said in the last blog.

this is the top of the teepee








These pictures shows the details of the teepee so far.


These pictures show the size of the teepee.

I have the fabric that when the frame is fitted and cut i will use. the fabric is polyester cotton and i got 10m of the material. this is what i have done so far and I will continue with this tomorrow by cutting down some of the frame and adding the fabric as well putting it together and add to it. So this is what i would to do tomorrow as i will be update with picture, what i have done on the 2nd day.